South Florida Sun-Sentinel

> To return to the main page of Get Local Delray Beach, please click here.

« Holocaust Remembrance Day, April 21 at Palm Beach Community College | Main | Consumer Traps & Tips »

Southern Palm Beach County Road Projects:

Atlantic Avenue / S.R. 806, from Via Flora to McNab Avenue
This $3.6 million, 2.7 mile construction project began on December 1, 2008, between Via Flora and McNab Avenue in Delray Beach. The work to be performed during this project includes: milling and resurfacing the roadway; replacing sidewalk curb ramps to meet current Americans with Disabilities Act (ADA) standards; and signalization, widening, and storm water drainage improvements at the intersection of Atlantic Avenue and Congress Avenue. The project is being built by Weekley Asphalt Paving, Inc. and is expected to be complete in fall 2009.

Restrictions: Daytime lane closures will occur, 9 a.m. until 3:30 p.m., at the intersection of Congress Avenue and Atlantic Avenue and other areas within project limits, as necessary, Monday through Friday. At least one lane will remain open in each direction at all times. Motorists might encounter delays through the intersection of Congress Avenue and Atlantic Avenue during non-peak daytime hours. One lane will remain open in each direction at all times.

Atlantic Avenue / S.R. 806, from NW/SW 12th Avenue to A1A
This $4.2 million construction project began January 5, 2009, from just east of I-95 to just west of A1A in Delray Beach. The work to be performed during this project includes: milling and resurfacing the roadway; replacing sidewalk curb ramps to meet current Americans with Disabilities Act (ADA) standards; and signalization, widening, and landscaping. The project is being built by Weekley Asphalt Paving, Inc. and is expected to be complete in late 2009.

Restrictions: Daytime lane closures will occur, 7 a.m. until 7 p.m., Monday through Friday, between SW/NW12th Avenue and Swinton Avenue, for project-related work. On-street parking will be restricted at various locations and side streets might be closed for drainage work in this area. Detours will be established and clearly marked, as necessary. Project-related work between E. 6th Avenue and A1A is tentatively scheduled to begin on May 10, 2009.

**************************************************************************************************************
Read Sunday, April 19 Sun-Sentinel Community News story about Boynton Beach H. S. Dimensional Harmony Chorus. CLICK HERE.

POSTED IN: Community Service (265)

Discuss this entry

TrackBack

TrackBack URL for this entry:
http://blogs.trb.com/cgi-bin/mt/mt-t.cgi/140911

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

To help keep spam off our site, please enter the letter "s" in the field below:

About This Blog

The Get Local community blogs are written by residents of the community. The Sun-Sentinel does not edit the blogs, nor take responsibility for the contents.

MORT MAZOR
Mazor has been a resident of West Delray since 1987. Since retiring as a marketing executive in New York City, he has...

More

Powered by Movable Type 3.36
Hosted by LivingDot

Add Get Local to Technorati Favorites